Flow target is the target area where the delivered changes
flow into. The flow target for repository workspaces
can be a stream or another workspace. When you create a repository
workspace from a stream, that stream becomes the default flow target.
Alternatively, when you create a repository workspace from My
Repository Workspaces, you can select a stream as the
flow target by clicking Flow with a stream.
Before changing the flow target, you must create a repository
workspace.
You can anytime change the flow target for a repository workspace.
You can specify different flow targets for each component in a repository
workspace. You can see the current flow target of a repository workspace
or a component in the
Pending Changes tool window.
The current flow target is displayed beside the repository workspace
or a component.
To change the flow target for a repository workspace:
- In the Pending Changes tool window,
right-click the repository workspace and click Change Flow
Target.
- In the Select a Stream or Workspace window,
select the type of flow target to search for. If the flow
target that you want to add is not displayed, type a text string to
specify the name of a stream or workspace. If you do not remember
the name of the stream or workspace, you can also type the owner's
name to see a list of streams or workspaces associated with that owner.
- Select a stream or workspace from the Matching
items list and click OK.